Permanents - Routes |
|
October 22 , 2017: Bob Goodison modified a route by Jeff Mudrakoff. Here is what Bob had to say about it: "I've taken some of the climbing out of Jeff Mudrakoff's Permanent # 135. It's different enough that it should probably be registered as a separate route. It will have further changes once the rail trail from Vernon to Winfield is open, which would remove the big climb out of Vernon." Here is Bob's RideWithGPS map, etc.
_